Deliverables:
Each team must provide the
following documentation in both hardcopy and digital form.
Document |
Deadline
Date |
|
Dec 2 |
||
Requirements document |
Detailing all the requirements/analysis of the website
broken down by Mandatory/Optional requirements. |
Dec 9 |
ER diagram |
Graphical display of the database design |
Jan 13, 15 |
Table/View Documentation |
Documentation detailing every table and view in the
database including fields. |
Jan 20,22 |
A process of identifying “events” that will occur on the
website; how the events are triggered and the resulting affect on the
database. |
Cancelled |
|
Two files are required.
One is a graphic display of the hierarchy of files and which files
call which. The other file lists all
scripting files, their location, purpose and if they have any includes. |
Jan 27,29 |
|
A detailed plan of how to backup and recover the database
and website in the event of a system crash.
Also, must include the scripts required to recreate the database. |
Feb 3,5 |
|
Test Cases |
A description of all test cases that were performed on the
website; the result of the test and any changes that resulted from the test. |
Feb 10,12 |
User Documentation |
General description of how the site works and how to
navigate throughout the site. |
Feb 20 |